Splitting a feature in Silver Catalyst

Posted on October 9th, 2009 in Silver Catalyst by siddharta || No Comment

It is now possible to split a feature in Silver Catalyst.

Why would you want to split a feature?

A couple of reasons

  1. The feature was too big, so you want to move a few of the tasks into a separate feature
  2. Not all of the tasks could be completed in a sprint, so you want to make a copy of the feature for rescheduling in the next iteration

Here is the step by step procedure for splitting a feature:

Continue reading ‘Splitting a feature in Silver Catalyst’ »

Interpreting the Cumulative Flow Diagram

Posted on October 8th, 2009 in Agile, Kanban by siddharta || No Comment

The cumulative flow chart is a power packed graph that can show you a number of important metrics in a single graph.

Here is how to figure out everything that the graph is telling you

Continue reading ‘Interpreting the Cumulative Flow Diagram’ »