Differences

This shows you the differences between two versions of the page.

Link to this comparison view

silver_catalyst:card_detail [2011/10/14 08:10]
admin scrum task card
silver_catalyst:card_detail [2012/03/30 16:47] (current)
admin removed archive icon part
Line 30: Line 30:
   * **WIP Override**. By default, the tool will not allow you to move a card to a column if it will break the WIP limit. When you enable this, it will allow the card to break the WIP limit and you can move it anywhere.   * **WIP Override**. By default, the tool will not allow you to move a card to a column if it will break the WIP limit. When you enable this, it will allow the card to break the WIP limit and you can move it anywhere.
   * **Timesheet entry**. Allows you to add an entry in the timesheet associated with this card. <wrap info>The timesheet plugin needs to be enabled for this icon to appear</wrap>   * **Timesheet entry**. Allows you to add an entry in the timesheet associated with this card. <wrap info>The timesheet plugin needs to be enabled for this icon to appear</wrap>
- 
-In addition, when a card is moved to a 'Pass' column, an additional icon is available 
- 
-{{:silver_catalyst:kanban_9.png?nolink&|}} 
- 
-This icon allows you to remove the card from the board and archive it. 
  
 ===== Scrum ===== ===== Scrum =====